Talus Partnership LtdParty Wall
Specialists

One of the core services of the Talus Partnership Ltd is party wall surveying services under the core legislation of the Party Wall etc. Act 1996 (the Act). This appointment is a personal appointment which the principle has been providing to clients, large and small, for in excess of 30 years.
bt_bb_section_bottom_section_coverage_image
https://www.taluspartnership.co.uk/wp-content/uploads/2022/06/download-3.jpg

Many domestic clients are either unaware that this legislation covers extension building work or loft conversion works, but the practice is able to help owners negotiate their way through this approval process in as quick a timescale as possible and in the most cost effective way.

As Party Wall specialists we have managed party wall appointments on extremely large construction projects, requiring multiple notices and multiple awards linked to demolition, sub-structure and superstructure phases; with some construction projects in excess of 100+ notices.

TALUS IS A SPECIALIST IN PARTY WALL SURVEYING UNDER THE PRIMARY LEGISLATION OF THE PARTY WALL ETC ACT 1996

bt_bb_section_top_section_coverage_image
Talus Partnership Ltd

Party Wall
Services

Building Owner Appointment
Scrutiny of proposals to assess implications in relation to the Party Wall etc. Act, 1996, ascertainment of the number of adjoining owners as defined by the Act, service of the necessary notices, preparation of schedules of condition, schedules of record photographs and award documentation, agreement of the award with the adjoining owner’s surveyor(s), construction stage monitoring of works, post completion signing off works and assessment of damage claims.
Adjoining Owner Appointment
Validity of the notice, service of counter notices as necessary, agreement of award documentation with the appointing owner, construction stage monitoring of works to ensure compliance with the award, post completion signing off negotiations and the presentation of damage claims.
Main Contractor Appointment
Negotiation of party wall awards on behalf of the main contractor to facilitate a programmed start on site, advice on contractor’s design proposals for design + construct procurement, pre-construction stage schedules of condition, schedules of record photographs, video schedules, construction stage monitoring of works and signing off negotiations.
Party Wall Impact Assessments
Assessment of schemes for implications with regard to the Party Wall etc. Act, 1996 and advice on avoiding/limiting those areas of the works which require notice.
Schedules of Condition
Preparation of schedules of condition, schedules of record photographs and/or video schedules to provide pre-construction stage building records.
Programme Advice
Assessment of the proposed works to ascertain programme impact for compliance with the Act, advice on the provision and co-ordination of design information and preparation of Microsoft Project programmes as required.
https://www.taluspartnership.co.uk/wp-content/uploads/2022/06/download-4.jpg

What notices do you need to serve?

What is a ‘Party Structure Notice’?

When the intention is to carry out works on a party wall, party floor or party fence wall separating two premises, a notice outlining the works will have to be served. By service of this notice, the building owner has the right to underpin, thicken or raise a party wall, make good, repair, demolish or rebuild a party wall if it becomes necessary due to its condition or because a stronger or higher wall is now required. This type of notice has a two month statutory period, however, in all cases, times can be changed by agreement.

What is a ‘Line of Junction Notice’?

The Act allows a building owner, by the service of a ‘Line of Junction Notice’ to build up to the line of junction (the boundary) and to place projecting footings and foundations as necessary on the adjoining owners’ land. Typically this would otherwise be a trespass but the Act provides the statutory authority to undertake such works. However, this is subject to the caveat of ‘special foundations’ that excludes reinforced foundations unless consent in writing is obtained. This type of notice has a one month statutory period unless the adjoining owner agrees in writing.

What is a ‘Three Metre Notice’?

When it is intended to excavate and build within three metres of an existing building and to a lower level than the base of its foundations, a notice of intended works will have to be served called a ‘Three Metre Notice’.

The adjoining owner must consent to the works set out within the three metre notice or a party structure notice within 14 days, otherwise a ‘dispute’ is deemed to have arisen and the adjoining owner must appoint a surveyor.

What is a ‘Six Metre Notice’?

When it is intended to excavate and build within six metres of an existing building and the building owners’ new foundations intersect a 45 degree line emanating from the base of the adjoining owner’s existing foundations, in line with the face of the flank wall, a notice of intended works called a ‘Six Metre Notice’ will have to be served. Like the Three Metre Notice, consent must be received within 14 days, or a dispute is deemed to have arisen.

If the building owner intends to employ piled foundations then the adjoining owner but-one may also require a notice if the 45 degree line from their foundations is also intersected. Three and six metre notices have a one month statutory period, unless the adjoining owner agrees in writing.

Download our factsheet on Party Wall matters

Click Here

bt_bb_section_top_section_coverage_image
What are the works that trigger a notice under the Party Wall Act?

Work to existing party walls, such as demolition, re-building, underpinning, cutting into a party wall to support load bearing beams (for example during a loft conversion), reducing or increasing the height of the wall or inserting a damp proof course, etc.

Work to some boundary walls, known as “party fence walls”.

New buildings, the external wall of which is up to or astride the boundary line.

Excavations and foundations within 3 metres of an adjoining structure and to a greater depth than the foundations of structure’s property.

Excavating foundations within 6 metres of an adjoining structure and below a 45° line drawn from the base of the foundations in line with the external face of the structure.

Choose Talus Partnership for help with notices and party wall awards

We believe that our project management expertise means that we can rationalise the process to the respective milestones of the project programme which brings efficiencies of time. As cost in the surveying sector is a function of time expended, this means we are able to pass on this reduced cost to our clients by lower fees.

Many London party wall surveying practices only provide party wall services in their team and sometimes don’t understand the works themselves, which we consider to be unsatisfactory.

Surveyors who provide the whole gamut of services have perspective on the process which is just one of many of the many approvals that the owner or developer needs.

Talus Partnership LtdContact Us
Contact James Hopkins directly via 07803 288047 for further details, or email jhopkins@taluspartnership.co.uk

Copyright Talus Partnership Ltd. All rights reserved.

Copyright Talus Partnership Ltd. All rights reserved.